Today I cut the slits for the pinch bolts and did a final fit check prior to powder coater having his way with them. I snapped a few pictures for your viewing pleasure.
Time spent today 0.5 hours total time spent on the mod 45 hours
This entry was posted on Tuesday, May 6th, 2008 at 11:54 pm and is filed under RV-3 Gear Legs Mod. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.