Tonight I started with making up the last support brace for the I-strut. I then took the I-strut over and tacked the support braces to the streamline tube and the 3/4″ tubes. I didn’t have whole lot of time tonight but I was able to finish off the I-struts all that is left is final welding.
Time spent today 1.5 hours
Total time spent 424.5 hours