Today I removed the clamps from last nights gluing of the lower left wing ply pieces. I got right to work gluing the lower right and lower left wing walk lower side plys. I also glued the lower left wing compression strut cap plys and glued the hand hold end caps that I made to square up the hand hold.
I filed and sanded the hand hold ply that I glue yesterday so that it tapers smoothly into the hand hold bow. I also filed the lower right and left wing tip cap to transition smoothly into the tip bows.
Time spent 2.5 hours
Total time spent 593.5 hours