Covering the Left elevator and starting the rib stitching on the horiz stabs

Tonight I had a softball game so I didn’t get to work on the plane until late. I decided to go ahead and try to cover the left elevator. I basically did the same thing as I did on the horizontal stabs but I was only able to get the lower side covered in 2 hours. While the glue was drying on the parts I marked and pre-punched both the horizontal stabilizers rib stitch holes. I then proceeded to rib stitch one of the stabilizer ribs. Fingers are imediatly sore like before…

Time spent today 2 hours
Total Time spent 925 hours.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

<span>%d</span> bloggers like this: