Yet another roll up post, I have been bad at not updating daily what I have been doing sorry! I was able to get the second brush coat on the upper side of the upper wing on the 7 dec after that I did the second coat of clear coat on the bottom side of the lower wings. The next day I was able to flip the lower wings over and get the clear done on that side too (8 dec). Last night (9 dec) was able to complete the rib stitching on one of the horizontal stabilizers and the elevators.
Time spent 10 hours.
Total time spent 972 hours