Finishing the fabrication and fitting of the wing root and horizontal tail root fairings

Tonight I spent the evening finishing up the fabrication and fitting of the lower wing root and horizontal tail root fairings. I borrowed the 90 deg adaptor for the drill and finished drilling the lower side of the horiztonal tail fairings (both sides). The lower wing root fairings I pre-drilled the holes in the metal the fitted the top side fairing up to the wing and drill those holes as well. Then I fitted and drill the holes for the leading edge fairings. And finally I made the bottom and top fairings come together nicely at the trailing edge.

https://picasaweb.google.com/109271578379288810018/NewWings#5779213701578441778

Time spent today 4 hours
Total time spent 1574 hours

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: