Belly pan fitting and misc nuts bolts and cotter pins

Tonight I spent several hours fitting the belly pan that I haven’t finished yet. I hadn’t checked the fit since I put the engine back on and I needed to cut out a part of it to fit around the gear leg. I also spent some time finishing up the flying wires by fairing them and then tightening the jam nut and installing the cotter pins. I also installed the second jam nut on the wing side of the wire. Finally I installed the torque tube aileron drive bolt.

Time spent 3 hours
Total time spent 1490 hours

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: