Tonight I imediatly finished covering the top side of the left elevator. While glue was drying I started and stop and eventully finished the rib stitching on the left horizontal stabilzer. Once the elevator glue was dry I did the initial shrink to 250 deg F. I then cranked up the Iron to 300 and then to 350 deg F. While the iron was stabilizing on the new temps I would continue rib stitching.
Time spent 4 hours
Total time spent 929 hours.